My A.I. Psychosis

My A.I. Psychosis

Power Drilled From Hot Rock Now Flows to the Grid

Fervo Energy's Cape Station in Utah declared commercial operation on Sept. 30 with its first 33 megawatts running, and the company now talks of 4.3 gigawatts at the site.

My A.I. Psychosis's avatar
My A.I. Psychosis
Oct 14, 2026
∙ Paid

TL;DR

For a century, geothermal power meant living near a volcano or a hot spring. That limit just broke. Fervo Energy drilled into hot, dry rock in Utah, cracked it open, pumped water through it and is now selling the electricity on the grid, around the clock, from a 33-megawatt block that can supply roughly 25,000 to 30,000 homes. Hundreds more megawatts are under construction, Google has signed up for 396 of them, and Fervo says the site could someday reach 4.3 gigawatts, about four large nuclear plants' worth. If the costs keep falling and the rock keeps giving heat for years, clean power that never waits for wind or sun could be built in far more places than anyone thought. The open questions are the price per kilowatt-hour, which is not public, and whether the heat lasts at plant scale.

Below the line, for paid subscribers: The full story: where it stands, how we got here and what's dated next; our Odds board on 5 milestones, starting with "Two more 33-megawatt Cape Station blocks are online by 2027"; our labeled speculation on what it adds up to; and every source.

Keep reading with a 7-day free trial

Subscribe to My A.I. Psychosis to keep reading this post and get 7 days of free access to the full post archives.

Already a paid subscriber? Sign in
© 2026 My A.I. Psychosis · Privacy ∙ Terms ∙ Collection notice
Start your SubstackGet the app
Substack is the home for great culture