My A.I. Psychosis

My A.I. Psychosis

Poland's Fast-Train Future Goes Underground: A 430-Ton Drill Head Just Dropped Into Łódź

A 430-ton cutterhead is in the launch shaft for a 4.6 km high-speed rail tunnel under Łódź, but continuous digging has slipped to spring 2027 (secondary report; the owner's own release was not found).

My A.I. Psychosis's avatar
My A.I. Psychosis
Nov 16, 2026
∙ Paid

TL;DR

Poland is digging a high-speed rail line straight under the city of Łódź, and the giant machine that will do it now has its teeth in the ground. A 430-ton cutterhead, the spinning front wheel of a boring machine about 14 meters (46 feet) across, has been lowered into a launch shaft in Łódź, where it will cut a 4.6-kilometer (2.9-mile) tunnel to the city's central Fabryczna station. The details, the numbers and our odds on what comes next are below the line. Subscribe to read them.

Below the line, for paid subscribers: The full story: where it stands, how we got here and what's dated next; and every source.

Keep reading with a 7-day free trial

Subscribe to My A.I. Psychosis to keep reading this post and get 7 days of free access to the full post archives.

Already a paid subscriber? Sign in
© 2026 My A.I. Psychosis · Privacy ∙ Terms ∙ Collection notice
Start your SubstackGet the app
Substack is the home for writing, podcasting, and media founders.