My A.I. Psychosis

My A.I. Psychosis

Fusion Plants That Run for Years, Not Seconds: Washington Funds 28 Projects on the Hard Parts

The Energy Department gave $8.5 million to 28 lab and university projects with 22 fusion companies, on materials, sensors and modeling. The winners list was not checked, so the exact technologies are unconfirmed.

My A.I. Psychosis's avatar
My A.I. Psychosis
Nov 09, 2026
∙ Paid

TL;DR

A fusion power plant is only useful if it can run for years, and that depends less on the dramatic plasma shots that make headlines than on the parts around them: walls that survive a constant hail of neutrons, sensors that can see inside a plasma hotter than the Sun's core, and computer models good enough to design a plant before it is built. On Nov. 2 the Department of Energy put $8.5 million into 28 small projects aimed at exactly those parts, pairing national labs and universities with 22 private fusion companies, and it opened next year's round with a new topic for early fusion pilot-plant designs. It is plumbing, not a physics breakthrough, and plumbing is what turns a lab record into a power station. Our odds that a fusion machine puts electricity on a U.S. grid: chance it works 75%, likely by 2031. For the full odds and the timeline of breakthroughs between today's grants and fusion power on the grid, subscribe.

Below the line, for paid subscribers: The full story: where it stands, how we got here and what's dated next; our labeled speculation on what it adds up to; and every source.

Keep reading with a 7-day free trial

Subscribe to My A.I. Psychosis to keep reading this post and get 7 days of free access to the full post archives.

Already a paid subscriber? Sign in
© 2026 My A.I. Psychosis · Privacy ∙ Terms ∙ Collection notice
Start your SubstackGet the app
Substack is the home for writing, podcasting, and media founders.